PV Ground-FaultDetector Interrupter (GFDI)Installation Instructions
980 AMP BREAKERCHARGE CONTROLLER #1TERMINAL BLOCKCHARGE CONTROLLER #2TERMINAL BLOCKTERMINAL BUS BARSHUNTGROUND BUS BARPV DISCONNECTBATTERY BANKDC POSI
1080 AMP BREAKER1/2 AMP GROUND FAULTGFDIPV DISCONNECTGREENWHITECHARGE CONTROLLER #3TERMINAL BLOCKDC NEGATIVEBATTERY +PV +CHARGE CONTROLLER #4TERMINAL
European Sales OceC/ Castelló, 1708830 - Sant Boi de LlobregatBARCELONA, EspañaPhone: +34.93.654.9568Corporate Oce19009 62nd Avenue NEArlington, WA
1About OutBack Power SystemsOutBack Power Systems is a leader in advanced energy conversion technology. Our products include true sine wave inverter/
2IMPORTANT SAFETY INSTRUCTIONSKEEP THESE INSTRUCTIONSThis product is intended to be installed as part of a permanently grounded electrical system as s
3FUNCTIONThe GFDI consists of a single 0.5 amp breaker, mechanically connected to a combination of 1, 2, or 4 standard OutBack 80 amp breakers (see li
4LABELS AND WARNINGSThe GFDI comes with a number of warning and identication labels pre-installed by OutBack. The following two labels are installed
5Installation Instructions• Insert the GFDI into the breaker mounting bracket.• Insertandhand-tightentheGFDI’smountingscrews. • CAUTION—o
6Once all breakers are turned on, the 0.5 amp breaker of the GFDI connects the grounding system to the battery negative, while the 80 amp breaker(s) c
7TO BATTERY POSITIVETO BATTERY POSITIVETO CC#2 BAT+43K OHM5 WATTGREEN WIREWHITE WIREDC NEGATIVEGROUND BUSTO CC#1 BAT+TO CC#3 BAT+TO CC#4 BAT+TO NEGATI
880 AMP BREAKERCHARGE CONTROLLER #1TERMINAL BLOCKTERMINAL BUS BARSHUNTGROUND BUS BARBATTERY BANKDC POSITIVE BUS BARDC NEGATIVEGNDBATTERY +PV ARRAYPV +
Komentáře k této Příručce